• mobilitylab.org site logo
  • Mobility Lab main menu search icon:  click to do a search
    • Understanding Transportation Demand Management
    • Transportation Demand Management In Action
      • Arlington Transportation Partners
        • The Practice of Transportation Demand Management
      • Information and Outreach
        • Commuter Services
        • Messaging
        • Champions Program
      • Learn more about TDM
        • Further Reading
    • Our Research
      • Travel Behaviors
        • Transit
        • Bike
        • Walk
        • Ridesharing
        • Micromobility
      • Arlington Analysis
        • Regional Surveys
        • Evaluations
        • Building Studies
      • Market Profiles
        • All Profiles
    • Transit Oriented Communities
    • Urban Planning
    • Resources
      • The Transportation Cost-Savings Calculators
        • ROI Calculator
        • TRIMMS 4.0
      • Research Data
        • Transit APIs
        • Archived Articles
      • Video Library
      • Infographics
      • Glossary Of Key Terms
    • About Us
      • Meet Our Team
      • Careers

The Practice of Transportation Demand Management

  • Home
  • Transportation demand management
  • Further reading

I-66 Doesn’t Need More Lanes or Expensive Infrastructure

July 3, 2014

Phase 1 of the Dulles Metrorail Megaproject off Route 123 near the future site of the Tysons East Station.

Yes, Virginia Interstate 66 is a mess. Commuters are right to decry the congestion along this stretch of interstate, where travel times from Northern Virginia into D.C. are the longest in the region.

But reports from Dr. Gridlock in the Washington Post that the state and federal governments are considering plans to add additional lanes onto I-66 are not only maddening, but they fly in the face of everything we’ve learned about induced demand.

With years of evidence to back it up, induced demand was defined beautifully in a recent story in Wired, which explained that because “increasing the supply of something (like roads) makes people want that thing even more … the ways we traditionally go about trying to mitigate jams are essentially fruitless.”

In other words, it’s impossible to build ourselves out of congestion because the roads themselves cause traffic.

While the Virginia Department of Transportation’s (VDOT’s) plan to implement “Active Traffic Demand” along the interstate is a better plan, VDOT’s request for proposals from private corporations indicates that the agency is also considering large, engineering- and infrastructure-intensive solutions to I-66’s problems.

Instead, why not entertain these much cheaper (and probably more reliable) solutions: transportation demand management (TDM) and use of high-occupancy vehicle lanes?

VDOT has been very good at congestion management when it has done big projects. Think back to the Mixing Bowl project, the Wilson Bridge Project, and the Mega Projects. VDOT pours money into transportation management programs (TMPs) that are designed to communicate about the problem and encourage people to share the ride, use transit, or avoid the area at peak times.

Yet at the end of each project, VDOT packs up its bag of tricks and leaves thinking that the job is done. Imagine if the kind of intensive effort VDOT gives as projects unfold were also applied to a corridor day in and day out, year after year. Could results be achieved? I think so. VDOT could spend $5 million to $10 million per year – not a lot for the agency – and do some really sophisticated TDM marketing and incentives.

VDOT could work with employers in D.C., Arlington, and Fairfax. It could promote carpooling and transit. It could provide incentives. It could provide real-time vanpool and commuter bus information. This stuff works. We’ve proven it in Arlington.

One could couple these TDM programs with HOV-3 both ways during the rush and HOV-2 at all other times to ensure that road use on I-66 is maximized. Getting the best use out of the existing facility (demand management) is what VDOT should concentrate on, not continually trying to increase the supply. It doesn’t work.

HOV-3 and TDM will work, will be more cost efficient, and are better long-term solutions for everyone.

Photo by Virginia Department of Transportation

 
share this item

Subscribe to Receive Updates on the Latest Mobility Research and Trends

Arlington Virginia Department of Environmental Services

Transportation Resources for Arlington County (TRAC) is funded in part by grants from the U.S. Department of Transportation (DOT), the Virginia Department of Transportation (VDOT) and the Virginia Department of Rail and Public Transportation (DRPT)

TRAC Family of Sites
  • Arlington Transit
  • Arlington Transportation Partners
  • Bike Arlington
  • Capital Bikeshare
  • Car-Free Near Me
  • CommuterDirect
  • CommuterPage
  • Dieta Cero-Auto
  • The Commuter Store
  • Walk Arlington
  • Terms and Conditions
Follow Us
  • facebook
  • twitter
  • linkedin
  • youtube
  • instagram

© 2026 Mobility Lab, a program of Arlington County, Virginia

Accessibility Adjustments

Accessibility Commitment for Mobility Lab

At Mobility Lab, we are committed to making our digital presence as accessible and inclusive as reasonably possible for all users, including individuals with disabilities. Our goal is to improve the usability of https://mobilitylab.org and to support a more accessible experience for everyone, regardless of their abilities or the technologies they use.

Our Approach to Accessibility

We aim to align with the Web Content Accessibility Guidelines (WCAG), which define internationally recognized standards for digital accessibility. While full compliance cannot always be guaranteed, we strive to implement improvements where feasible and regularly review accessibility-related aspects of our website. Accessibility is an ongoing process, and we are committed to improving the experience over time as technologies, standards, and user needs evolve.

Accessibility Features

To support accessibility, https://mobilitylab.org may utilize tools/plugins as the accessibility toolbar. This interface provides users with a range of helpful features, including:
  • Adjustable text size and contrast settings
  • Highlighting of links and text for better visibility
  • Full keyboard navigation of the toolbar interface
  • Quick launch via keyboard shortcut: Alt + . (Windows) or ⌘ + . (Mac)
Please note the following:
  • The availability and effectiveness of these features depend on the website's configuration and ongoing maintenance.
  • While we strive to ensure accessibility, we cannot guarantee that every part of https://mobilitylab.org will be fully accessible at all times. Some content may be provided by third parties or affected by technical constraints beyond our immediate control.

Feedback and Contact

We welcome your feedback. If you experience any accessibility barriers or have suggestions for improvement, please contact us: Email: info@mobilitylab.org We are committed to reviewing all inquiries and aim to respond within 3–5 business days. If you require assistance accessing any part of this website, we are happy to provide support through alternative channels upon request. Last updated: February 19, 2026
How long do you want to hide the toolbar?
Hide Toolbar Duration
Select your accessibility profile
Vision Impaired Mode
Enhances website's visuals
Seizure Safe Profile
Clear flashes & reduces color
ADHD Friendly Mode
Focused browsing, distraction-free
Blindness Mode
Reduces distractions, improves focus
Epilepsy Safe Mode
Dims colors and stops blinking
Content Modules
Font Size

Default

Line Height

Default

Color Modules
Orientation Modules